d. The activity is being performed under the direct supervision of a crew foreman
trained and competent in this type of work. The foreman is the Job Supervisor
(person to whom Hot Line Order has been issued).
e. The critical distance between energized parts and the equipment or load is
monitored with an insulating measuring device while the equipment or load is being
moved within the 10-foot (3-meter) distance.
f. Each piece of mechanized equipment is properly grounded with a minimum 1/0
AWG extra-flexible copper or equivalent ground lead (refer to paragraph 3. for
grounding method. No one, other than necessary operating or work personnel, are
permitted in contact with equipment, during its operation. The operation or work
personnel are on the equipment, i.e. not operating from a position on the ground.
the operating capabilities of the equipment meet all the mechanical conditions
outlined in
5 (FIST 3 - 29 5/90)