11
    
    Maintenance or Test
    Recommended Interval
    Reference
    Visual inspection
    Monthly
    FIST Volume 3-6, Table 3
    Battery float voltage
    Shift, monthly
    FIST Volume 3-6, Table 3
    Cell float voltage
    Monthly, semi-annually
    FIST Vol 3-6, Table 3
    Temperature
    Quarterly
    FIST Volume 3-6, Table 3
    Connection resistance
    Quarterly (25 percent)
Annually (100 percent)
    FIST Volume 3-6, Table 3
    Internal resistance
    Quarterly
    FIST Volume 3-6, Table 3
    Capacity testing
    Annually and semi-annually If
capacity test less than
90 percent
    FIST Volume 3-6, Table 3
IEEE 1188-1996
    Safety equipment inspection
    Monthly
    FIST Volume 3-6, Table 3
IEEE 1188-1996
    Infrared scan
    Annually
    NFPA 70B 18-17
    
    Maintenance or Test
    Recommended Interval
    Reference
    Visual inspection
    Monthly, annually
    FIST Volume 3-6,
Table 4
    Battery float voltage
    Shift, monthly, quarterly,
semi-annually
    FIST Volume 3-6,
Table 4
    Cell float voltage
    Quarterly
    FIST Volume 3-6,
Table 4
    Temperature
    Quarterly (pilot cell)
    FIST Vol 3-6, Table 4
    Intercell connection retorque
    Annually
    FIST Volume 3-6,
Table 4
    Capacity testing
    5-year, annually if capacity less than
90 percent
    FIST Volume 3-6,
Table 4
IEEE 1106-1995
    Safety equipment inspection
    Monthly
    FIST Volume 3-6,
Table 4
IEEE 1106-1995
    Infrared scan
    Annually
    NFPA 70B 18-17