EZ Maintenance CMMS Software Img



background image
18
9.6 Medium and High Voltage SF6 Breaker Maintenance Schedule
Maintenance or Test
Recommended Interval
Reference
Review equipment ratings
5 years
NERC Planning Standard
Preventive maintenance
Per Manufacturer's
Instruction Book
Manufacturer's Instruction
Book
Record gas pressure and
temperature, compare with
tolerances
Biweekly
Manufacturer's Instruction
Books
Record operations counter
Biweekly
Manufacturer's Instruction
Books
Visual inspection
Biweekly, annually, 5 years
Manufacturer's Instruction
Books
Check foundation, grounds,
paint
5 years
Manufacturer's Instruction
Books
WAPA Standard
Maintenance Guidelines,
Chapter 13
Check external screws, bolts,
electrical terminals tight
Annually Manufacturer's Instruction
Books
Contact resistance test, power
factor insulation test, motion
analyzer, trip test, moisture test
on gas
5 years
WAPA Standard
Maintenance Guidelines,
Chapter 13
Verify operation and calibration
of temperature and pressure
switches and gages
5 years
WAPA Standard
Maintenance Guidelines,
Chapter 13
Check oil levels; carbon brush
condition; heater operation,
tightness of terminals, linkages,
screws, bolts; latch, linkage,
operating mechanism
adjustments
5 years
Manufacturer's Instruction
Books
Overhaul breaker with new
seals, contacts, nozzles
10 to 15 years or 4,000 to
10,000 operations (more
frequent if high current
operation)
Manufacturer's Instruction
Books
Overhaul disconnect, grounding,
and breaking switches
15 years or 5,000 to
10,000 operations
Manufacturer's Instruction
Books
CMMS Fleet Maintenance Software for Fleet, Vehicle, & Equipment Maintenance

This Information is Reprinted From UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION