33
    
    Maintenance or Test
    Recommended Interval
    Reference
    Fault/load study and
recalculate settings
    5 years
    Reclamation
Recommended Practice
    Electro-mechanical relays
Calibration and functional
testing
    Upon commissioning and every
2 years
    Reclamation
Recommended Practice
    Solid-state relays
Calibration and functional
testing
    Upon commissioning
1 year after commissioning
5 years
    Reclamation
Recommended Practice
    Micro-processor relays
Calibration and functional
testing
    Upon commissioning
1 year after commissioning
8-10 years
    Reclamation
Recommended Practice
    Protection circuit functional
test
    Annually
    FIST Volume 3-8
Manufacturer's
Instruction Books
    Check red light lit for lockout
relay and circuit breaker coil
continuity
    Daily
    1
    Reclamation
Recommended Practice
    Lockout relays
Cleaning and lubrication
    5 years
    Power Equipment Bulletin
No. 6
    
    1
    In staffed plants, in conjunction with daily operator control board checks. Otherwise, check each
    
    visit to the plant.
    
    
    Supervisory Control and Data Acquisition (SCADA) systems are computer-based, real-
time control systems for power and water operations. Since these systems are in
operation continuously and are in many ways self-diagnosing, regular maintenance
and testing is not necessary except as recommended by the manufacturer. However,
circuits that are infrequently used may require periodic functional testing to ensure
they will be operational when the need arises.
    Security requirements affecting SCADA are dictated by documents such as
Presidential Decision Directive 63: Critical Infrastructure Protection, May 22, 1998
and Office of Management and Budget (OMB) Circular A-130, Appendix III, Security
of Federal Automated Resources, February 8, 1996. Periodic audits, Critical
Infrastructure Protection Plans (CIPP), and regularly scheduled security training are
important requirements of SCADA security.