2.11 Inspection Checklist
Hydraulic Turbines and Large Pumps Inspection Interval
1. Runner or impeller NS A
2. Spiral case and draft tube or NS A
pump casing and suction inlet
3. Wearing rings NS A
4. Main shaft packing W NS
5. Mechanical seals W NS
6. Wicket gates and facing plates NS A
7. Servomotors, shift ring, and wicket gate linkage NS A
8. Bearings NS D A
9. Shaft and coupling A
10. Generator or motor rotor A
11. Air coolers NS A
12. Unit brakes NS A
13. Generator carbon dioxide
(CO2)
system S A
14. Inspection reports A
Auxiliary Pumps
15. Pump impeller or rotor and casing
NS A
16. Shaft and coupling
W A
17. Packing
NS W
18. Mechanical seals
W
19. Bearings
W
20. Pressure relief valves
NS
21. Eductors
NS
D - Daily
W - Weekly
M - Monthly
S - Semiannual
A - Annual
NS - Not scheduled (extraordinary maintenance; usually 5-year or longer intervals)
Hydraulic Turbines and Large Pumps
1.
Runner or impeller
Annual. Examine runner or impeller thoroughly for cavitation or other damage. Use a
nondestructive test to check for cracks in runner buckets or impeller vanes. Refer to FIST,
Volume
2-5, Turbine Repair
for repair recommendations and techniques.
Not Scheduled. Remove runner or impeller and inspect and repair areas not normally accessible.